Segment 3 of the I-75 Modernization Project requires the design and reconstruction of 1.5 miles of rural freeway and 4 miles of urban depressed freeway including service drives, ramps and bridges. A key aspect of the design requires the construction of a new 14 ft. diameter, 4-mile-long storage and drainage tunnel and pump station.